New-Construction Final Inspections

Brad checks accessible attic spaces and home systems during an inspection.
Independent insight before closing.
Your newly built home deserves an independent inspection before closing. Brad Leland examines visible and accessible components of your completed home, documenting construction defects, incomplete work, and potential concerns that may need your builder’s attention.
Estimate your final-inspection fee, then call Brad to discuss readiness and access.
Get Your Inspection QuoteWhy an Independent Inspection Matters
Does a brand-new home need an independent inspection?
Yes. Even a newly constructed home can have installation defects, incomplete work, or components requiring attention. An independent final inspection provides an additional evaluation of visible and accessible systems before closing, separate from builder quality-control and municipal inspections.
An inspection is a visual assessment of accessible components, not a guarantee that every defect will be discovered. Earlier foundation pre-pour and frame inspections examine accessible work before concrete or drywall conceals it; the final inspection cannot recreate that earlier visibility.
Compare new-construction inspection stages ↗
Brad examines an exterior electrical panel during a new-construction final inspection.
What Brad Examines
Brad evaluates visible and accessible components of the completed home, subject to applicable inspection standards, access and conditions at the property. These include:
- Foundation and structural components
- Roof and attic
- Electrical systems and panels
- Plumbing systems and fixtures
- Heating, ventilation and air conditioning
- Windows, doors and interior finishes
- Exterior components
- Installed appliances
He documents visible defects, incomplete work and conditions that may need correction or further evaluation.
Before Closing: When to Schedule
Schedule your new-construction final inspection when the home is substantially complete, utilities are connected, and installed systems are ready for evaluation. Ideally, arrange it before the builder’s final walkthrough and closing so you have time to review the findings.
If work remains unfinished, let Brad know when scheduling. Incomplete, inaccessible or nonoperating components can limit what he can inspect.
Your Inspection Report and Builder Walkthrough
When Will I Receive My Inspection Report?
Brad generally delivers new-construction final inspection reports the same day the inspection is performed. Your report includes photographs and clear descriptions of his findings, giving you information to review with your builder before your final walkthrough and closing.
The builder determines how to respond to the findings.
You are welcome to attend the inspection, ask Brad questions and discuss his findings.
Is Thermal Imaging Included in My New-Home Inspection?
Yes. Brad uses thermal imaging when appropriate, at no additional charge. It can reveal temperature differences that may indicate moisture, missing insulation, or other conditions requiring further evaluation.
Thermal imaging cannot see through walls or detect every concealed defect. Brad may also use moisture meters and ZipLevel foundation measurements as part of his evaluation.
Learn About 11-Month Builder Warranty Inspections ↗New-Construction Inspections Across Greater Houston
Brad serves communities throughout Greater Houston and the Gulf Coast.
South & Southeast Houston
League City, Dickinson, Texas City, La Marque
West & Northwest Houston
Katy, Fulshear, Cypress, Bridgeland, Brookshire
Galveston & Coastal Communities
Galveston's West End, Tiki Island
Elevated foundations and access
Brad inspects elevated pier-and-beam foundations, including beach houses and elevated coastal homes around Galveston and the Greater Houston Gulf Coast, when accessible without crawling. There is no additional fee simply because a home has an elevated pier-and-beam foundation. He does not perform inspections requiring crawling beneath low-clearance pier-and-beam homes. Please call to discuss access before scheduling.